Polyurethane rubber

Polyurethane rubber is mid-range to firm hardness (Shore A40 – A90), high-performance. They offer superior strength, toughness, and abrasion-resistance that result in durable molds that capture and reproduce exact textures and the finest detail from any model.

Most concrete mixes and polyurethane resins require a suitable release agent.

Vacuum degassing mixed material using a vacuum pump and chamber to remove entrapped air is recommended

Polyurethane Rubber

Features

  • Two-part polyurethane rubbers
  • Room temperature cure (cold cure)
  • High hardness A40 – A90, which silicone rubber unable to reach
  • Super-strength, 3 times strenght than silicone rubber, high abrasion-resistant, super-tough rubbers
  • Reproduces fine details and textures
  • Long-lasting, economical
  • Ideal for high volume casting applications
  • All rubbers can be demolded after ~16 hours
Polyurethane rubber

Typical Uses & Casting Materials

Primarily used for high production concrete casting, forming, texture mats and concrete stamps.

Item
Mixing ratio by weight
Hardness
Viscosity(cps)
Working time
Demould-time

PU40

A:B=100:40

40A±3

1000~4000

5~15 Mins.

4~8 hours

PU50

A:B=100:50

50A±3

1000~4000

5~15 Mins.

4~8 hours

PU60

A:B=1 : 1

60A±3

1000~4000

5~15 Mins.

4~8 hours

PU70

A:B=120 : 100

70A±3

1000~4000

5~15 Mins.

4~8 hours

PU80

A:B=1 : 1

80A±3

1000~4000

5~15 Mins.

4~8 hours

PU90

A:B=70 : 100

90A±3

1000~4000

5~15 Mins.

4~8 hours

Instruction

  1. Stir Part A well before use, Stir Part B well before use.
  2. Vacuum degas air of Part A and Part B first.
  3. Weigh proper Part A and Part B using an accurate scale and a clean mixing container.
  4. Vigorously mix and scrape walls of the container, continue mixing fast within 2 minutes until uniform.
  5. Pour the mixture 2-3 inches above the pattern in a thin stream.
  6.  Wait it to cure at room temperature.
  7. To get a higher strength, you can heat the mold in the oven under 100℃ for 4-5 hours again.
  8. put into production after 7 day

Important tips

  • Before use, read the operation manual, please.
  • Before large production, a small-scale test is recommended.
  • Mixing A&B fast, within 2 minutes
  • Use a vacuum to de-gas this product before use under pressure. Vacuum for 2-3 minutes
  • A release agent is required
  • In order to get the best performance, heat to cure is strongly recommended.
  • Use a casting machine to operate is strongly recommended.
  • Both Parts A and B react with atmospheric moisture and, therefore, should be resealed or used up as soon as possible after opening.

Package

PU RUBBER

Storage & shelf-life

9 months in unopened containers when properly stored.

Both Parts A and B react with atmospheric moisture and, therefore, should be resealed or used up as soon as possible after opening. Before resealing, a heavier-than-air, dry gas, can be sprayed into open containers to displace moist air and extend storage life.

Scroll to Top